ER52 Fire Station Warning SignalsCX(s) Applied: B2.2Date: 09/26/2011Location(s): Richland, WashingtonOffice(s): River Protection-Richland Operations Office, Golden Field Office
Removal of the 204-AR Facility Diesel Generator and Associated Underground 550 Gallon Fuel TankCX(s) Applied: B6.1Date: 09/21/2011Location(s): Richland, WashingtonOffice(s): River Protection-Richland Operations Office
Security Barrier Relocation at the 618-11 Burial GroundsCX(s) Applied: B1.15Date: 09/19/2011Location(s): Richland, WashingtonOffice(s): River Protection-Richland Operations Office, Golden Field Office
Training Exercises and Simulations on the Hanford SiteCX(s) Applied: B1.2Date: 09/19/2011Location(s): Richland, WashingtonOffice(s): River Protection-Richland Operations Office
Acquisition, Installation, Operation, and Removal of Communication Systems, Data Processing Equipment, and Similar Electronic Equipment on the Hanford Site, Richland, WashingtonCX(s) Applied: B1.7Date: 08/29/2011Location(s): Richland, WashingtonOffice(...
241-T Tank Farm Debris Barrier FenceCX(s) Applied: B1.11Date: 08/22/2011Location(s): Richland, WashingtonOffice(s): River Protection-Richland Operations Office, Golden Field Office
Bat Roost Tower ConstructionCX(s) Applied: B1.20Date: 08/11/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011CX(s) Applied: B1.3Date: 06/28/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Routine Custodial ServicesCX(s) Applied: B1.3Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Safety and Environmental Improvements of a Facility, and Replacement/Upgrade of Facility ComponentsCX(s) Applied: B2.5Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office