Bonneville Power Administration (BPA) proposes to repair existing underground storage tank drop tube, spill bucket, and two pipe caps. Small portio…
BPA proposes to fund the Coeur d’Alene Tribe to fill, and thus deactivate, four ditches and one channel that was excavated to drain the Hangman Cre…
The Bonneville Power Administration (BPA) proposes to fund the Columbia River Estuary Study Taskforce (CREST) to implement a wildlife habitat resto…
Bonneville Power Administration (BPA) proposes to replace insulators on two structures located at 17/4 of the 500 kV Grizzly – Captain Jack No. 1 a…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g., cross arms, insulators,…
BPA proposes to remove a failed culvert and associated fill material. The work would include excavating approximately 20,000 cubic yards of existin…
Bonneville Power Administration (BPA) proposes to remove a critical transmission line impairment (P02646) along its Pearl-Keeler No. 1 transmission…
Bonneville Power Administration (BPA) proposes to fund Cascade Forest Conservancy (CFC) to install a series of beaver dam analogs (BDAs) and simila…
Bonneville Power Administration (BPA) proposes to conduct routine maintenance on access roads providing access to electrical transmission infrastru…
Bonneville Power Administration (BPA) proposes to remove retired radio equipment and antennas from the communication facilities at Capital Peak, Ol…