Bonneville Power Administration (BPA) proposes to install a very high frequency (VHF) whip antenna on an existing 120-foot-tall communications towe…
Bonneville Power Administration (BPA) proposes to fund the Washington Department of Fish and Wildlife (WDFW) to conduct the ongoing study of reprod…
Bonneville Power Administration (BPA) proposes to replace an existing two-pole suspension structure and associated structural and electrical compon…
Bonneville Power Administration (BPA) proposes to upgrade two radio station sites with new antennas and equipment. This CX has been updated to incl…
Bonneville Power Administration (BPA) proposes to improve existing landings at structures 26/4 and 26/8 on the Targhee-Drummond transmission line in the Idaho Falls TLM District. The proposed project would allow safe and timely access to the transmission line structures which would reduce outage times and maintain reliable power in the region.
Bonneville Power Administration (BPA) proposes to install new auto-sectionalizing equipment at switch B-169 near structure 14/1 on the 115-kilovolt (kV) Albeni Falls-Sand Creek No. 1 transmission line near Laclede, Bonner County, Idaho (Township 56 North, Range 3 West, Section 30).
The Bonneville Power Administration (BPA) proposes to fund routine operations and maintenance and habitat restoration activities on lands owned and managed by the Kalispel Tribe in Washington and Idaho to address the negative impacts to fish and wildlife species and habitats affected by the construction and operation of the Albeni Falls Dam.
BPA proposes to remove invasive Himalayan blackberry from the area surrounding artificial chum spawning channels at Hamilton Springs near North Bonneville, WA.
BPA proposes to sell the BPA Mountain Avenue Substation to the City of Ashland. The proposed activity would be to sell the BPA substation and the associated fee-owned substation property to the city. The City of Ashland would then operate the substation. BPA would retain easements for the substation including the tap line into the substation.
Bonneville Power Administration (BPA) is proposing to replace eight deteriorating wood pole structures and any associated hardware and guys at specific locations in BPA’s Olympia District. For all structures, the work would include removing the existing wood pole structures (and guy wires if present) and replacing them with in-kind in the same location.