BPA would be selling the East Hills Substation to South Side Electric. The new change of ownership at East Hills Substation would be the point at …
Bonneville Power Administration (Bonneville) proposes to allow applicant to remove up to two overhead lines and install up to two new underground l…
Bonneville Power Administration (BPA) proposes to install a new communications tower at the summit of Grouse Peak in Custer County, Idaho. BPA is c…
Bonneville Power Administration (BPA) proposes to fund Yakama Nation Fisheries to complete a low tech process-based habitat restoration project alo…
Bonneville Power Administration (BPA) proposes to replace 58 deteriorating wood poles and associated structural/electrical components (e.g. cross a…
Bonneville Power Administration (BPA) proposes to install two new switches on the Grandview-Red Mountain No. 1 transmission line near Snipes Substa…
Bonneville Power Administration (BPA) proposes to fund the Columbia Land Trust (CLT) to implement a residential structure removal on CLT-owned land…
Bonneville Power Administration (BPA) proposes to replace its aging and outdated very high frequency (VHF) two-way radio and ground-level equipment…
BPA proposes to fund Trout Unlimited (TU) to replace a roadway culvert on Muddy Springs, located on the Pahsimeroi River in Custer County, two mile…
Bonneville Power Administration (BPA) proposes to replace the 6 GHz digital radio equipment system located at Horse Butte and Birch Creek Radio Sta…