Bonneville Power Administration (BPA) proposes to expand Salmon River Electric Cooperative, Inc.’s (Salmon River Electric) Spar Canyon substation l…
BPA proposes to provide funding to the Confederated Tribes of the Yakama Nations to conduct annual routine maintenance activities at the Melvin R. …
BPA proposes to replace ten structures and improve access roads on the Dorena Tap to Alvey-Martin Creek No. 1, Eugene-Alvey No. 2, Lane-Fairview Fi…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at specific l…
Bonneville Power Administration (BPA) proposes to replace portions of the roof drainage system at BPA’s untanking tower located at the Chehalis Sub…
The Bonneville Power Administration (BPA) is proposing to replace facility entry signs at several BPA substations and maintenance headquarters (MHQ…
Bonneville Power Administration (BPA) proposes to allow the Cowlitz Public Utility District (PUD) to remove poles from BPA fee-owned land outside L…
Bonneville Power Administration (BPA) proposes to install a temporary, vehicle barrier near the Mount Hebo communications site. Before the 7-foot-l…
Bonneville Power Administration (BPA) proposes to continue funding the Pacific States Marine Fisheries Commission (PSMFC) for ongoing work as a par…
Bonneville Power Administration (BPA) proposes to perform landing work and insulator replacement on Chief Joseph – Monroe No. 1 structure 43/6 in t…