Bonneville Power Administration (BPA) proposes to replace in-kind replacement of wood pole structures and associated structural/electrical componen…
Bonneville Power Administration (BPA) proposes to allow the City of Port Angeles (the City) to remove and replace wood monopole structures on the C…
BPA proposes to sell the BPA Cascade Locks Substation to the City of Cascade Locks. The proposed activity would be to sell the BPA substation and t…
BPA proposes to fund the Custer Soil and Water Conservation District to drill two wells in Custer County, one mile southwest of May, Idaho. These w…
Bonneville Power Administration (BPA) proposes to allow American Forest Management (AFM) Company the temporary use of the current access road route…
Bonneville Power Administration (BPA) proposes to adopt and implement the modifications to the Open Access Transmission Tariff, commonly known as T…
Bonneville Power Administration (BPA) proposes to repair and improve access roads along the Driscoll-Naselle 115-kV No. 1 transmission line between…
Bonneville Power Administration (BPA) proposes to allow Northern Wasco County PUD (PUD) to remove a segment of the PUD’s line and pole that provide…
Bonneville Power Administration (BPA) proposes to rebuild its Hood River Co-Op Service No. 1 transmission line from Hood River Substation to struct…
Bonneville Power Administration (BPA) is proposing to replace a section of failed fiber optic cable along the Shelton-Fairmount No. 1 transmission …