Categorical Exclusion Determinations: Bonneville Power Administration

Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Insulator Replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 Transmission Line CX(s) Applied: B4.6 Date: 07/16/2013 Location(s): Washington Offices(s): Bonneville Power Administration
2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration