Spring Creek-Wine Country #1 Dampener Project CX(s) Applied: B1.3Date: 03/18/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Olympia-St. Clair Emergency Impairment Remedy CX(s) Applied: B4.6Date: 03/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Burns Communication Site Upgrade (update to previous CX issued January 13, 2015) CX(s) Applied: B1.3Date: 03/11/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Taft Substation Retaining Wall and Stormwater Maintenance Project CX(s) Applied: B1.3Date: 03/11/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Ellensburg Guy Wire Installation CX(s) Applied: B4.9Date: 03/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Garrison Substation Equipment Acquisition CX(s) Applied: B1.7Date: 03/02/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
McNary Substation Maintenance Warehouse Demolition CX(s) Applied: B1.23Date: 02/26/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Hardeson Battery Generator Integration CX(s) Applied: B4.11Date: 02/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Heyburn Substation Heating, Ventilation and Air Conditioning (HVAC) Replacement CX(s) Applied: B1.4Date: 02/25/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Trentwood Substation Communication Upgrade CX(s) Applied: B1.19Date: 02/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration