Paul Substation 500-Kilovolt Reactor Installation CX(s) Applied: B4.11Date: 04/07/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Removal and Relocation of Equipment from Leased Area in Tital Data Center CX(s) Applied: B1.31Date: 04/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Alberton Radio Site Construction CX(s) Applied: B1.19Date: 04/06/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
BPA Idaho Falls District 2015 Wood Pole Replacement and Access Road Maintenance CX(s) Applied: B1.3Date: 04/02/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Lower Monumental-Hanford #1 Insulator Project CX(s) Applied: B1.3Date: 03/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Dark Canyon Conservation Easement Acquisition CX(s) Applied: B1.25Date: 03/27/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Longview Substation Sanitary Sewer Upgrade CX(s) Applied: B4.9Date: 03/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Snohomish-Murray Structure 7/6 Guywire Relocation CX(s) Applied: B4.6Date: 03/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Grandview-Red Mountain #1 Wood Pole Replacement CX(s) Applied: B1.3Date: 03/18/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Little Goose-Lower Granite #1 Wood Pole Replacement CX(s) Applied: B1.3Date: 03/18/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration