The City of Caliente will be replacing electric meters for both residential and industrial residents to smart meters. Also, using a web based softw…
The project seeks to expand critical grid management capabilities by boosting network capacity, enhancing control of loads from inverter-based reso…
Purchase, excavation, construction, and installation of a 5MW/20 MWh battery backup system in Estes Park, Colorado. This will be used to serve 4 cr…
Meter replacement, Implementing AI Dash to track vegetation growth, and software upgrades.…
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) is proposing to extend its power resource commitments, create a r…
On October 6, 2014, DOE issued Presidential Permit No. PP-362, authorizing Champlain Hudson Power Express, Inc. (CHPEI) to construct, operate, main…
Purchase and Installation of utility scale battery storage for electric distribution grid resilience demonstration.…
Increase the resiliency and reliability of renewable hydroelectric generation-based grid through battery energy storage system integration.…
Bonneville Power Administration (BPA) proposes to construct a new 230-kV bay at the McNary Substation, and relocate, replace, and install new trans…
Remove the three phase overhead power line located on the East side of US-75 from the service pole for One Fire Casino, North to the intersection o…