Installation of smart meters on all 3210 meters in the system to allow for real-time data infrastructure to monitor and control outages and assist …
Western Area Power Administration, Sierra Nevada Region (WAPA) proposes to participate in the California Independent System Operator's (CAISO) Exte…
The project involves installing underground electric circuits and installation of advanced protection and controls devices on existing utility pole…
This project will underground or replace existing overhead services served from the selected transformers, dependent on customer acceptance, easeme…
Bancroft plans to install new switchgear and convert overhead electric lines to underground lines. …
Muscatine Power plans to underground distribution equipment, upgrade existing equipment, and add power management equipment (fault indicators, sect…
Install Advanced Metering Infrastructure (AMI) to increase grid resilience through improved outage and restoration data and processes. The project …
Expand IMPA's Advanced Metering Infrastructure (AMI) features by adding True Grid Reliability Analytics (TGRA) and Tantalus Transformer Analytics (…
1.Reconfigure 41 miles of power line insulators 2. Reconductor 23 miles of transmission line 3. Relocate 2.1 miles of overhead conductors…
Grid automation upgrades with purchasing two mobile BESS to enable the grid flexibility and efficiency needed to achieve the goals and objectives.…