Recipient and sub-recipients to standardize the control and communications of modular microgrids. No construction planned during project.…
Bonneville Power Administration (Bonneville) proposes to amend the existing Columbia River Non-Treaty Storage Agreement (NTSA) with British Columbi…
Installation of an Automated Metering Infrastructure System (AMI) - Replacement of electric meters with new meters capable of communicating with th…
Installation of overhead equipment attached to new utility poles, except the ISG switchgear, which is the installation of a padmount vacuum switchg…
Prairie Energy Coop. will replace existing three-phase oil circuit reclosers with three-phase electronic reclosers in forty-nine locations that com…
Replacement of reactors in the Ahsahka substation. Improve wildfire mitigation through aerial inspection of overhead power lines, and software upgr…
Installation of smart meters on all 3210 meters in the system to allow for real-time data infrastructure to monitor and control outages and assist …
Western Area Power Administration, Sierra Nevada Region (WAPA) proposes to participate in the California Independent System Operator's (CAISO) Exte…
The project involves installing underground electric circuits and installation of advanced protection and controls devices on existing utility pole…
This project will underground or replace existing overhead services served from the selected transformers, dependent on customer acceptance, easeme…