Bancroft plans to install new switchgear and convert overhead electric lines to underground lines. …
Muscatine Power plans to underground distribution equipment, upgrade existing equipment, and add power management equipment (fault indicators, sect…
Install Advanced Metering Infrastructure (AMI) to increase grid resilience through improved outage and restoration data and processes. The project …
Expand IMPA's Advanced Metering Infrastructure (AMI) features by adding True Grid Reliability Analytics (TGRA) and Tantalus Transformer Analytics (…
1.Reconfigure 41 miles of power line insulators 2. Reconductor 23 miles of transmission line 3. Relocate 2.1 miles of overhead conductors…
Grid automation upgrades with purchasing two mobile BESS to enable the grid flexibility and efficiency needed to achieve the goals and objectives.…
The proposed project involves replacement of existing fuses with vacuum reclosers in strategic locations within the borders of the Southern Ute tri…
Install field sensors on existing utility poles. Develop a software tool that processes data from installed sensors and will be demonstrated in a u…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…