Conversion of 4.0 miles of existing overhead distribution line from three-phase 4/0 ACSR to 477 ACSR on wooden poles using a spacer cable support s…
Installation of remotely controlled electronic recloser on the distribution system.…
Replace old hydraulic reclosers with new electronic reclosers with electronic control. Change out device utility poles at existing locations. …
1. Demo fuse cutouts on utility poles in 59 locations. 2. Install Compact Modular Reclosers and Remote Control Units on utility poles above.…
Replacement of the analog Automatic Transfer Control system with a digital electronic Transfer Control System.…
The Community Lighthouse Project is an ongoing project that aims to install solar panels and battery storage on nonprofits and community organizati…
The recipient will install line sensors, cameras, and other devices for monitoring the electrical system and providing for wildfire mitigation.…
The recipient will use integration of modernized software: distribution management system (ADMS), distributed energy resources management system(DE…
meter replacements, communications infrastructure, and software upgrades, including pilot systems and testing.…
Rooftop Solar Installation, line extensions, installation of interconnections, transformers, batteries and electric vehicle chargers…