Recipient will design the Advanced Metering Infrastructure and install the Distributed Automation component including Regulators, Capacitor Panels,…
Bonneville Power Administration (BPA) proposes to adopt and implement the modifications to the Open Access Transmission Tariff, commonly known as T…
Bonneville Power Administration (BPA) proposes to construct a new 230-kV bay at the McNary Substation, and relocate, replace, and install new trans…
Western Area Power Administration, Sierra Nevada Region (WAPA) proposes a rate process to continue existing formula rates for the Central Valley Pr…
Characterization activities for CO2 storage complex to include: drilling USDW well
The SEASCOM solution is to integrate the eGauge to the existing home installed solar system. The system will be first tested in the lab and then de…
Bonneville Power Administration (BPA) proposes to install three new motor operated disconnect switches, a new bus configuration, and relaying equip…
Specifically, the project team will deploy, test, and validate a prototype AI system across an electric bus fleet with a goal to verify cost saving…
The Desert Southwest Region (DSW) of the Western Area Power Administration proposes to extend the existing transmission service rates for the Pacif…
BPA proposes to allow the US Army Corps of Engineers (USACE) to interconnect its Unit 6 turbine at Libby Dam to BPA’s transmission system on BPA’s …