Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon CX(s) Applied: B4.11, B4.13Date: 41859 Location(s): OregonOffices(s): Bonneville Power Administration
      Categorical Exclusion Determination
      Davis Dam Maintenance Building Installation at the old Davis Dam 69 Kilovolt West Switchyard  CX(s) Applied: B4.11Date: 41820 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
      Deer Park Substation Connection Modifications  CX(s) Applied: B4.11 Date: 06/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
      Santiam Substation 230 Kilovolt Shunt Reactor Replacement  CX(s) Applied: B4.11 Date: 05/05/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
      Alfalfa Substation Control House Replacement  CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
      Celilo Converter Station Upgrades (update to previous CX issued on 7/25/13 and 3/11/14)  CX(s) Applied: B4.11 Date: 04/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
      33 MVA Electrical Power Substation Project - TJSO-SC-14-01  CX(s) Applied: B4.11, B4.12, B1.13 Date: 02/10/2014 Location(s): Virginia Offices(s): Thomas Jefferson Site Office
      St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line  CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
      Terry Ranch Road Substation (Amended)  CX(s) Applied: B1.24, B4.1, B4.11 Date: 12/04/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region