Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Utility Corridor Extension CX(s) Applied: B4.7, B4.11, B5.2, B5.5 Date: 06/13/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program, Bettis Site
Categorical Exclusion Determination
Terry Ranch Road Substation CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Archer Communications Building Laramie County, Wyoming CX(s) Applied: B4.6, B4.11 Date: 03/07/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Grant County Public Utility District - Columbia Substation Interconnection Project CX(s) Applied: B4.11 Date: 02/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
General Motors Battery Pack Assembly Plant - Electric Substation Upgrade CX(s) Applied: B4.11 Date: 01/18/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Bristol to Groton Transmission Line Upgrade ProjectCX(s) Applied: B4.11Date: 10/11/2011Location(s): South DakotaOffice(s): Western Area Power Administration-Upper Great Plains Region
Cattle Creek SubstationCX(s) Applied: B4.11Date: 09/27/2011Location(s): Bonneville County, IdahoOffice(s): Bonneville Power Administration
Maxwell - O'Banion Optical Ground WireCX(s) Applied: B1.7, B4.6, B4.7, B4.11Date: 09/15/2011Location(s): Sutter County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region, National Energy Technology Laboratory