Shelton-Fairmont Number 2 115-Kilovolt Tap  CX(s) Applied: B4.11 Date: 09/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration
      Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory  CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tenness...
      Tucson Substation 162/262 Breaker Replacement  CX(s) Applied: B3.1, B4.11 Date: 09/05/2012 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
      Franklin Substation Upgrades  CX(s) Applied: B4.11 Date: 08/19/2013 Location(s): Washington Offices(s): Bonneville Power Administration
      Celilo Converter Station Upgrades  CX(s) Applied: B4.11 Date: 07/25/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
      Cottonwood-Roseville Optical Groundwire Project  CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region
      Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition  CX(s) Applied: B4.11 Date: 07/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
      Kalispell Shunt Cap Addition Project  CX(s) Applied: B4.11 Date: 07/01/2013 Location(s): Montana Offices(s): Bonneville Power Administration
      Glen Canyon Switchyard - 230 Kilovolt Wavetrap Removal - TZ9A2 on the Navajo Line  CX(s) Applied: B4.11 Date: 06/21/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
      Liberty Substation Transformer Replacement Project, Maricopa County, Arizona  CX(s) Applied: B4.11 Date: 06/06/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region