Optimization of Electrical Power at the Portsmouth Gaseous Diffusion Facility  CX(s) Applied: B4.6, B4.11 Date: 08/09/2012 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office
      Sno-King Substation Expansion  CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration
      Line Switch Replacements at Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps  CX(s) Applied: B4.6, B4.11 Date: 07/30/2012 Location(s): Wyoming, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
      Line Switch Replacements at Chappell and Julesburg Taps in Deuel County, Nebraska and Kersey Tap in Weld, Colorado  CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Nebraska, Colorado Offices(s): Western Area Power Administration-Rocky Mountain...
      Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado  CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
      Utility Corridor Extension  CX(s) Applied: B4.7, B4.11, B5.2, B5.5 Date: 06/13/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program, Bettis Site
      Categorical Exclusion Determination
      Terry Ranch Road Substation  CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
      Archer Communications Building Laramie County, Wyoming  CX(s) Applied: B4.6, B4.11 Date: 03/07/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
      Grant County Public Utility District - Columbia Substation Interconnection Project  CX(s) Applied: B4.11 Date: 02/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration