General Motors Battery Pack Assembly Plant - Electric Substation Upgrade  CX(s) Applied: B4.11 Date: 01/18/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory
      Bristol to Groton Transmission Line Upgrade ProjectCX(s) Applied: B4.11Date: 10/11/2011Location(s): South DakotaOffice(s): Western Area Power Administration-Upper Great Plains Region
      Cattle Creek SubstationCX(s) Applied: B4.11Date: 09/27/2011Location(s): Bonneville County, IdahoOffice(s): Bonneville Power Administration
      Maxwell - O'Banion Optical Ground WireCX(s) Applied: B1.7, B4.6, B4.7, B4.11Date: 09/15/2011Location(s): Sutter County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region, National Energy Technology Laboratory
      Movement of the Shirley Pump Substation To a New Site and Replacement of the Shirley Pump Substation TransformerCX(s) Applied: B4.11Date: 07/14/2011Location(s): MontanaOffice(s): Western Area Power Administration-Upper Great Plains Region
      Interconnection of the Pronghorn Gas Plant 115 Kilovolt Transmission LineCX(s) Applied: B4.11Date: 07/14/2011Location(s): MontanaOffice(s): Western Area Power Administration-Upper Great Plains Region
      Addition of a New Substation Near Lake Bowdoin, MontanaCX(s) Applied: B4.11Date: 07/14/2011Location(s): Lake Bowdoin, MontanaOffice(s): Western Area Power Administration-Upper Great Plains Region
      Circle Substation ExpansionCX(s) Applied: B4.11Date: 07/14/2011Location(s): MontanaOffice(s): Western Area Power Administration-Upper Great Plains Region
      Interconnection of the Letcher to Mitchell 115 Kilovolt Transmission Line to Western's Letcher SubstationCX(s) Applied: B4.11Date: 07/08/2011Location(s): MontanaOffice(s): Western Area Power Administration-Upper Great Plains Region
      North Oakes Tap of the Edgeley to Forman 69 Kilovolt lineCX(s) Applied: B4.11Date: 06/08/2011Location(s): North DakotaOffice(s): Western Area Power Administration-Upper Great Plains Region