Categorical Exclusion Determinations: B4.11

Davis Dam Maintenance Building Installation at the old Davis Dam 69 Kilovolt West Switchyard CX(s) Applied: B4.11Date: 41820 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Celilo Converter Station Upgrades (update to previous CX issued on 7/25/13 and 3/11/14) CX(s) Applied: B4.11 Date: 04/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
33 MVA Electrical Power Substation Project - TJSO-SC-14-01 CX(s) Applied: B4.11, B4.12, B1.13 Date: 02/10/2014 Location(s): Virginia Offices(s): Thomas Jefferson Site Office
St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Terry Ranch Road Substation (Amended) CX(s) Applied: B1.24, B4.1, B4.11 Date: 12/04/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tenness...