BPA proposes to install generation metering and telemetry equipment for integration of a total 20-megawatt (MW) wave energy project.…
Office of NEPA Policy and Compliance
July 1, 2021BPA proposes to install generation metering and telemetry equipment for integration of a total 20-megawatt (MW) wave energy project.