Ellensburg Substation Expansion and Control House Addition CX(s) Applied: B4.11Date: 07/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Gila Substation Stage 07 Rebuild Project and Related Communications Equipment Replacement CX(s) Applied: B4.11Date: 07/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Fullerton Tap CX(s) Applied: B4.11Date: 07/15/2015 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Troy Substation Tap Yard Expansion CX(s) Applied: B4.11Date: 07/14/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Ellensburg-Moxee Line Impairment Correction CX(s) Applied: B4.11Date: 06/17/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Towner Switchyard Construction CX(s) Applied: B4.11Date: 06/08/2015 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Mingusville Tap CX(s) Applied: B4.11Date: 06/08/2015 Location(s): MontanaOffices(s): Western Area Power Administration-Upper Great Plains Region
Alvey Substation 230-Kilovolt Reactor Replacement CX(s) Applied: B4.11Date: 04/24/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Alcoa Power Sales Contract Amendment CX(s) Applied: B4.11Date: 04/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Nippon Biomass Generation Project - Large Generator Interconnection Request No. G0504 CX(s) Applied: B4.11Date: 04/20/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration