Moxee Substation Equipment Upgrades CX(s) Applied: B4.11Date: 42521 Location(s): WashingtonOffices(s): Bonneville Power Administration
Construction of the Goshen County Substation Goshen County CX(s) Applied: B4.11Date: 05/17/2016 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region
Terry Ranch Road Sub Erosion Control CX(s) Applied: B4.11Date: 05/16/2016 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region
Combined Photovoltaic/Battery Grid Integration with High Frequency Magnetics Enabled Power CX(s) Applied: B4.11, B5.1Date: 04/19/2016 Location(s): North CarolinaOffices(s): National Energy Technology Laboratory
Mead Substation Security Guard Building CX(s) Applied: B4.11Date: 04/01/2016 Location(s): NevadaOffices(s): Western Area Power Administration-Desert Southwest Region
Tucson Substation Rebuild, Stage 02 CX(s) Applied: B4.11Date: 03/30/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Keeler Substation Electrical Reactor Replacement CX(s) Applied: B4.11Date: 03/18/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
200 Area Electrical Substation Expansion Facility 551 - Water Main CX(s) Applied: B4.11Date: 12/08/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Snohomish Substation Equipment Replacement and Expansion Project CX(s) Applied: B4.11Date: 09/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration