B94 Hazardous Gas Alarms CX(s) Applied: B1.29, B2.1, B2.2, B2.3, B2.5 Date: 12/09/2011 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Add Time Delay to 772-1F Main Exhaust/Supply Air Interlock Circuit CX(s) Applied: B2.3 Date: 11/10/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Degraded Chemical Hood Exhaust Duct in 735-A, D-wing Service Floor CX(s) Applied: B2.3 Date: 10/25/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Versailles Borough Stray Gas Mitigation - ContinuationCX(s) Applied: B2.3, B2.5, B6.1Date: 09/13/2011Location(s): Versailles, PennsylvaniaOffice(s)...
Gore Substation Safety Lighting CX(s) Applied: B2.3 Date: 09/01/2011 Location(s): Oklahoma Offices(s): Southwestern Power Administration
HAZGAS and Fire Alarm Monitoring SystemCX(s) Applied: A11, B2.2, B2.3Date: 08/25/2011Location(s): Albany, OregonOffice(s): Fossil Energy, National Energy Technology Laboratory
Elverta Maintenance Facility RemodelCX(s) Applied: B1.4, B1.15, B2.1, B2.3, B2.5Date: 08/24/2011Location(s): Sacramento County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region
Building 40 New Video SurveillanceCX(s) Applied: A11, B1.15, B2.3Date: 08/22/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
Building 4 Mezzanine RenovationCX(s) Applied: B1.3, B2.3Date: 08/03/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
Recovery Act: San Bernardino Associated Government Natural Gas Truck ProjectCX(s) Applied: B2.2, B2.3, B5.1Date: 06/14/2011Location(s): Fontana, CaliforniaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory