Add Blanks in Central Hood Exhaust (CHEX) Ductwork Between FLT-14 and FLT-15 and Between FLT-31 and FLT-32 CX(s) Applied: B2.3 Date: 04/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 30, 2013Add Blanks in Central Hood Exhaust (CHEX) Ductwork Between FLT-14 and FLT-15 and Between FLT-31 and FLT-32
CX(s) Applied: B2.3
Date: 04/30/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
For each of the two locations (CHEX-FLT-14 and 15 and CHEX-FLT-31 and 32), this activity removes two 1/8 inch thick by roughly 3 feet by 2 feet stainless steel spacers and their associated gaskets from the CHEX system in B-005.
CX(s) Applied: B2.3
Date: 04/30/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
For each of the two locations (CHEX-FLT-14 and 15 and CHEX-FLT-31 and 32), this activity removes two 1/8 inch thick by roughly 3 feet by 2 feet stainless steel spacers and their associated gaskets from the CHEX system in B-005.