Security Camera Installation CX(s) Applied: A11, B1.7, B1.15, B2.2, B2.3 Date: 09/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades CX(s) Applied: B2.1, B2.2, B2.3 Date: 09/07/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
B-22A Renovation CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5 Date: 08/31/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Pittsburgh B83 Boiler Room Ventilation/Cooling Project CX(s) Applied: B2.1, B2.2, B2.3 Date: 08/29/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Parking Garage Gutter Replacement and Installation of Roof Ice Melt System CX(s) Applied: B2.3, B2.5 Date: 08/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5 Date: 06/08/2012 Location(s): Illinois Offices(s): New Br...
Midwest Region Alternative Fuels Project CX(s) Applied: B2.3, B5.1 Date: 02/09/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory
Add Blanks in Central Hood Exhaust (CHEX) System Ductwork Between FLT-17 and FLT-18 CX(s) Applied: B2.3 Date: 02/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
B94 Hazardous Gas Alarms CX(s) Applied: B1.29, B2.1, B2.2, B2.3, B2.5 Date: 12/09/2011 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Add Time Delay to 772-1F Main Exhaust/Supply Air Interlock Circuit CX(s) Applied: B2.3 Date: 11/10/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office