Categorical Exclusion Determination
Install Pedestrian Signal Lights at Crosswalks CX(s) Applied: B2.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Idaho National Laboratory Engineering Demonstration Facility Safety Shower Installation CX(s) Applied: B2.3Date: 09/08/2015 Location(s): IdahoOffices(s): Nuclear Energy
Replace roofing system at 702-F CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Storm Shelter Control Project CX(s) Applied: B2.3Date: 06/22/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration
High-efficiency Low Global-Warming Potential (GWP) Compressor Award Number: DE-EE0007039 CX(s) Applied: A9, B2.3, B3.6 Buildings Technologies Office Date: 05/18/2015 Location(s): CT Office(s): Golden Field Office
Idaho National Laboratory Fire Stations' Vehicle Exhaust Extraction Systems Replacement CX(s) Applied: B2.3Date: 05/14/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Design and Installation of Gas Cabinet for Gas Cylinder Storage in K Area CX(s) Applied: B2.3Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Emergency Eyewash/Shower Station in Room B6 of the Radiochemistry Laboratory CX(s) Applied: B2.3Date: 02/17/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Install New 773-A CHEX HEPA Filter Fluid Seal Housings CX(s) Applied: B2.3Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office