Add Blanks in CHEX Ductwork Between FLT-7 and FLT-8 and Remove Out-of-Service OGE Ducting CX(s) Applied: B2.3Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Routine Maintenance Activities CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5 Date: 01/26/2014 Location(s): New Jersey Offices(s): Princeton...
Add Blanks in CHEX Ductwork Between FLT-34 and FLT-35 CX(s) Applied: B2.3 Date: 12/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction and Maintenance Activities at Existing Field Offices and Operation Centers CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23 Date: 10/17/2013 Location(s): CX: non...
Safety, Health, and Environmental Improvements for FY2014 and FY2015 CX(s) Applied: B2.1, B2.2, B2.3, B2.5 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Disconnect Equipment and Activate Gloveboxes From Lab 174, Gloveboxes 12 & 13 CX(s) Applied: B2.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Building 58 Third Floor Mezzanine Enclosure CX(s) Applied: B2.1, B2.2, B2.3 Date: 07/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Replace 735-A South Header Ductwork Located on D-wing Service Floor CX(s) Applied: B2.3 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory