CX-010605: Categorical Exclusion Determination

Building 58 Third Floor Mezzanine Enclosure CX(s) Applied: B2.1, B2.2, B2.3 Date: 07/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

July 25, 2013
Estimated Read Time   min
Building 58 Third Floor Mezzanine Enclosure
CX(s) Applied: B2.1, B2.2, B2.3
Date: 07/25/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory

Enclose the third floor mezzanine of B 58.