CX-009591: Categorical Exclusion Determination

Installation of a Ballymore Ladder at Sampling Location 4MC-002F CX(s) Applied: B2.3 Date: 12/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

December 19, 2012
Estimated Read Time   min
Installation of a Ballymore Ladder at Sampling Location 4MC-002F
CX(s) Applied: B2.3
Date: 12/19/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Sampling Location 4MC-002F requires pedestrian negotiation of a steep creek bank covered in riprap. The creek bank end of the ladder will be secured by bolting it to two sign posts driven into the ground on top of the creek bank. The stream end of the ladder will be secured by pushing the ladder rails into the stream bottom.