Remove the end of life asphalt roof shingles, overlay existing wood deck with 0.5" plywood, and install new 35 year asphalt shingles.…
CX(s) Applied: Multiple, Weatherization Assistance Program, Location(s): Multiple, Office(s): Golden Field Office
The proposed action replaces the dial pressure indicators with digital gauges and installs instrument calibration valves on the Advanced Test React…
The purpose of this Environmental Checklist (EC) is to address the redesign and installation of the new Advanced Test Reactor (ATR) Low Pressure Ai…
K-Area owns a space Cf-252 Shuffler that will be disassembled for disposal at the time that the formerly utilized Shuffler is being disasembled for…
The Mission Support Contractor (MSC) and its subcontractors perform installation of, improvements to, building and equipment instrumentation (inclu…
Award Number: DE-IE0000116, CX(s) Applied: A9, B2.2, B5.1, Office of Indian Energy, Location(s): CA, Office(s): Golden Field Office
In 2016, Power Management identified the need to store heavy equipment indoors during adverse weather conditions. …
DOE LM is proposing to conduct the following ongoing operations activities and routine maintenance actions at the DOE LMBC, a U.S. General Services…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…