Remove the end of life asphalt roof shingles, overlay existing wood deck, and install new 35-year asphalt shingles.…
This project will consist of removing the obsoletecomponents of the existing fire system and installing new equipment.…
Three of the four gloveboxes are in need of modifications to enable regular helium leak checks by plumbing helium from the existing helium distribu…
Remove the end of life asphalt roof shingles, overlay existing wood deck with 0.5" plywood, and install new 35 year asphalt shingles.…
CX(s) Applied: Multiple, Weatherization Assistance Program, Location(s): Multiple, Office(s): Golden Field Office
The proposed action replaces the dial pressure indicators with digital gauges and installs instrument calibration valves on the Advanced Test React…
The purpose of this Environmental Checklist (EC) is to address the redesign and installation of the new Advanced Test Reactor (ATR) Low Pressure Ai…
K-Area owns a space Cf-252 Shuffler that will be disassembled for disposal at the time that the formerly utilized Shuffler is being disasembled for…
The Mission Support Contractor (MSC) and its subcontractors perform installation of, improvements to, building and equipment instrumentation (inclu…
Award Number: DE-IE0000116, CX(s) Applied: A9, B2.2, B5.1, Office of Indian Energy, Location(s): CA, Office(s): Golden Field Office