The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing offices in five stat…
Remove LCS-37, 38, 39, and 44 Radiation Monitors per DCP No. J-DCP-S-05009 in 221-S.…
Currently there is no functioning level detection or automatic water fill capability for the IF-603 chiller water storage tank. Levels are checked …
The IF-611 and IF-627 fire protection panels and the associated fire protection devices in these buildings, need to be upgraded to increase system …
The scope of this project is to upgrade the Kesselring Site (KS) Site Service Water (SSW) and the Sanitary Sewer (SS) systems.…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site.…
This modification will transition all of the head-end components of the E3S Closed Circuit TV system to IVAS.…
The U.S. Department of Energy (DOE) to perform alterations to a building and construct a support structure to house a Large Item Neutron Assay System
Remodel the B17 Central High Bay area to provide updated offices with new furniture, doors, fire suppression system, new infrastructure, new HVAC, …
Replace Building 751-1A Fire Alarm System.…