Project Y-757 replaces E3S with the Argus Security System for components not already identified by Projects Y-738, Y-732 and Y-724 in the Tritium F…
This modification will replace E3S in the Tritium Extraction Facility (TEF) with the Lawrence-Livermore National Laboratory (LLNL) Argus Security S…
INL needs to manage facilities and property in a safe, secure, cost-effective, and sustainable manner to ensure assets are available, utilized, and…
To ensure continued worker safety, next generation air monitors will be installed.…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site.…
Install new LED Lights fixtures for BoilerMaker Shop located in Building 717-1N.…
Complete Temp Mod 233H-TMC-18-261 to disconnect the exhaust fan and dampers from the interlock chain for Room 41 oxygen monitor.…
This modification will transition all of the head-end components of the E3S Closed Circuit TV system to IVAS.…
The proposed project will replace three 8" PIVs and one 6" PIV at IF-616 and one 6" PIV at IF-617. A new 8" PIV and 8" curb box valve will also be …
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing substations and swit…