The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
K-Area public address system in 704-K (War Room) and 701-2K (Command Area) will be upgraded.…
New fire panelswill be installed at buildings MFC-701, MFC-710, and MFC-725 that will connect to the site fiber optic cable for communication local…
Award Number: DE-EE0009140, CX(s) Applied: A9, B3.6, B2.2, Advanced Manufacturing Office, Location(s): DC, Office(s): Golden Field Office
The purpose of this EC is to replace the existing cask bagging ring vacuum and purge system controls in the Hot Fuel Examination Facility (HFEF), M…
Award Number: DE-EE0009139, CX(s) Applied: A9, A11, B2.2, Advanced Manufacturing Office, Location(s): CO, Office(s): Golden Field Office
CX(s) Applied: Multiple, State Energy Program, Location(s): Multiple, Office(s): Golden Field Office
Remove the end of life asphalt roof shingles, overlay existing wood deck, and install new 35-year asphalt shingles.…
This project will consist of removing the obsoletecomponents of the existing fire system and installing new equipment.…
Three of the four gloveboxes are in need of modifications to enable regular helium leak checks by plumbing helium from the existing helium distribu…