This is for the addition of two new fire hydrants at Bryan Mound.
The Ohio State University’s Nuclear Reactor Laboratory (OSU-NRL) proposes to acquire custom-built replacements for some essential OSU Research Reactor (OSURR) control-room equipment that has been in continuous service for decades.
The University of Wisconsin (UW) proposes to enhance the neutron radiography capabilities at the UW Nuclear Reactor (UWNR) and associated Characterization Laboratory for Irradiated Materials (CLIM), by acquiring a high-resolution detector, rotation stage, visualization software and a high-performance computer.
The University of Maryland (UMD) proposes to replace the Radiation Area Monitors (RAMs) for the Maryland University Training Reactor (MUTR).
The University of California, Irvine (UCI) proposes to purchase a fuel surveillance camera, digital console chart recorder, and personal dosimetry system to increase the safety and security of its Mark I TRIGA reactor facility.
Reed College proposes to improve the reliability of its reactor program by obtaining a spare Compensated Ion Chamber (CIC) to monitor the reactor power. Reed College has a TRIGA 250 kW reactor equipped with a rotary specimen rack and pneumatic transfer system.
Oregon State University (OSU) proposes to maintain the operational capacity factor of its TRIGA® Reactor (OSTR) by obtaining spare parts for items that, if spares were unavailable, could potentially cause a prolonged outage.
North Carolina State University proposes to upgrade and enhance the safety, operations, and utilization infrastructure of its PULSTAR reactor.
Install outdoor PA speakers per attached work instructions in 703-41A, 703-42A, 703-43A, 702-2A, 730-4B, 711-1N and 706-N.…
Installation of transient voltage surge suppressors in the Z-Area Saltstone Facility Process Room…