Award Number: GFO-SEP-ALRD-2019bCX(s) Applied: MultipleState Energy ProgramLocation(s): MultipleOffice(s): Golden Field Office
Award No: GFO-SEP-ALRD-2019aCXs: A11, A9, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19, B5.20, B5.22, B5.23, B2.2SEPLoc: MultOffice: GFO
Current fire alarm detection system is obsolete. Spare parts are no longer available. System does not comply with NFPA 72 requirements. This modifi…
This modification will replace the Electronic Safeguards and Security System (E3S) in the Tritium Extraction Facility (TEF) with the Lawrence-Liver…
The dial room at the Specific Manufacturing Capability in building Test Area North-601 lacks a fire suppression system. The proposed action designs…
FOA No: WAP-ALRD-2019CXs Applied: A9, A11, B5.1, B5.16, B5.17, B1.34, B1.16, B3.1, B2.2WIPOLocation: MultOffice: Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing facilities in five stat…
Award Num: WAP-ALRD-2019CXs Applied: A9, A11, B5.1, B5.17, B1.34, B1.16, B3.1, B2.2, B5.16WeatherizationLocation: MultOffice: Golden
This Categorical Exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…