CX-020017: K-Area Electronic Safeguards and Security System (E3S) Replacement & Argus Implementation
This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…
Modifications to the walls and ceiling in the office located within the Materials and Fuels Complex-774 Zero Power Physics Reactor control room hav…
Subcontractor shall provide all materials, tools, equipment, supplies, transportation,
facilities, and services required for the installation of...
facilities, and services required for the installation of...
Award Number: GFO-SEP-ALRD-2019bCX(s) Applied: MultipleState Energy ProgramLocation(s): MultipleOffice(s): Golden Field Office
Award No: GFO-SEP-ALRD-2019aCXs: A11, A9, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19, B5.20, B5.22, B5.23, B2.2SEPLoc: MultOffice: GFO
Current fire alarm detection system is obsolete. Spare parts are no longer available. System does not comply with NFPA 72 requirements. This modifi…
This modification will replace the Electronic Safeguards and Security System (E3S) in the Tritium Extraction Facility (TEF) with the Lawrence-Liver…
The dial room at the Specific Manufacturing Capability in building Test Area North-601 lacks a fire suppression system. The proposed action designs…
FOA No: WAP-ALRD-2019CXs Applied: A9, A11, B5.1, B5.16, B5.17, B1.34, B1.16, B3.1, B2.2WIPOLocation: MultOffice: Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing facilities in five stat…