Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Micro-Synchrophasors for Distribution Systems CX(s) Applied: B1.7, B3.6Date: 01/24/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
Bertelsen Substation Metering Panel Segment Addition CX(s) Applied: B1.7 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8 Date: 12/19/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Mission Support Alliance Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B1.7 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Communication Line Installation Between Manhole F-39 and Building 221-12F CX(s) Applied: B1.7 Date: 11/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Communications, Computing, and Data Processing Activities CX(s) Applied: B1.7, B4.7 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office
Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install) CX(s) Applied: B1.7 Date: 10/31/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Malin Substation Relay Equipment Replacements CX(s) Applied: B1.7 Date: 10/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration