Communication Line Installation Between 245-15F and a Temporary Shed CX(s) Applied: B1.7Date: 04/28/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Garrison Substation Equipment Acquisition CX(s) Applied: B1.7Date: 03/02/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Chemawa Substation Equipment Acquisition CX(s) Applied: B1.7Date: 01/06/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Remove IT Equipment from Research Ridge Building 3 CX(s) Applied: B1.7Date: 41879 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Equipment Installations at Multiple Substations and Radio Facilities CX(s) Applied: B1.7 Date: 07/14/2014 Location(s): Washington, Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Advanced Test Reactor (ATR) Electronic Message Board Installation CX(s) Applied: B1.7Date: 41830 Location(s): IdahoOffices(s): Nuclear Energy
Harney Substation Digital Communications Upgrade CX(s) Applied: B1.7 Date: 06/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Maintain/Repair SPR Radio Communications Network, 2014-2017 CX(s) Applied: B1.7 Date: 06/11/2014 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Replace West Hackberry Ported Coax at Northwest Perimeter (WH-OM-1194) CX(s) Applied: B1.7 Date: 06/09/2014 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Slatt Substation Meter and Communication Equipment Installation CX(s) Applied: B1.7 Date: 05/05/2014 Location(s): Oregon Offices(s): Bonneville Power Administration