MSA Annual Categorical Exclusion for Electronic Equipment CX(s) Applied: B1.7Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
AT&T to Install Fiber Optic Cable Along South Carolina Highway 125 and SRS Road 1 CX(s) Applied: B1.7Date: 10/28/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Routine Activities CX(s) Applied: B1.3, B1.4, B1.6, B1.7, B1.9, B1.11, B1.16, B1.17, B1.20, B1.22, B1.23, B1.24, B1.25, B1.30, B1.34, B2.2, B2.3, B2.5, B4.1, B4.2, B4.3, B4.4, B4.6, B4.8, B4.10, B5.1, B5.6Date: 10/25/2015 Location(s): Multiple Location...
Deploy Wireless Guest Networks at Strategic Petroleum Reserve Sites CX(s) Applied: B1.7Date: 10/01/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Umatilla Electric Cooperative Solar Interconnection CX(s) Applied: B1.7Date: 09/28/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Design/Build Kroll Room Upgrade Project CX(s) Applied: B1.7, B1.31Date: 09/28/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
ADAS Life Cycle Management Services, 2015-2020 CX(s) Applied: B1.7Date: 09/25/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Bayou Choctaw Wi-Fi/Radio Replacement Pilot CX(s) Applied: B1.7Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project CX(s) Applied: B1.7, B2.2Date: 07/22/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Albany Natural Gas and Water Metering CX(s) Applied: B1.7, B2.2Date: 06/11/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory