"Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center
CX(s) Applied: B1.7 Date: 11/01/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration"
CX(s) Applied: B1.7 Date: 11/01/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration"
246-2H Conduit Routing CX(s) Applied: B1.7 Date: 10/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hardeson Small Generator Integration CX(s) Applied: B1.7 Date: 09/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration
McLoughlin Substation Equipment Additions CX(s) Applied: B1.7 Date: 09/05/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
DE-FOA-0000797: Innovation for Increasing Cybersecurity for Energy Delivery Systems (I2CEDS) CX(s) Applied: A1, A9, A11, B1.2, B1.7 Date: 08/16/2013 Location(s): Multiple States Offices(s): National Energy Technology Laboratory
Paisley Geothermal Integration CX(s) Applied: B1.7 Date: 08/09/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Categorical Exclusion Determination for Indoor, Small- and Pilot-Scale Research and Development CX(s) Applied: A9, B1.7, B3.6, B3.10, B3.12, B3.15, B5.1, B5.15 Date: 08/05/2013 Location(s): California Offices(s): Berkeley Site Office
Strategic Petroleum Reserve Computer Services, 2015-2020 CX(s) Applied: B1.7 Date: 07/11/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration