Replacing Traditional Electric Meters with Smart Electric Meters - City of Newark, Delaware CX(s) Applied: B1.7 Date: 07/23/2012 Location(s): Delaware Offices(s): Golden Field Office
Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Infrastructure Demolition, Replacement, and Related Activities at the Weldon Spring, Missouri, Site CX(s) Applied: B1.3, B1.7, B1.15, B1.23, B1.24, B1.26, B1.36, B3.1, B4.7 Date: 05/31/2012 Location(s): Missouri Offices(s): Legacy Management
Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville ...
Integration of the Echo Point Community Wind Generation Project CX(s) Applied: B1.7 Date: 03/20/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Smart Wire Grid, Inc. - Distributed Power Flow Control Using Smart Wires for Energy Routing CX(s) Applied: A9, B1.7, B3.6 Date: 02/17/2012 Location(s): California, Missouri, North Carolina, Georgia, Tennessee Offices(s): Advanced Research Projects Age...
Simulated Based Engineering User Center CX(s) Applied: B1.7, B1.15 Date: 02/08/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Exe-Guard (Formerly Whitelist) Antivirus Project CX(s) Applied: A1, A9, A11, B1.2, B1.7 Date: 01/30/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory
Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration