Integration of the University of Oregon’s Cogeneration Project CX(s) Applied: B1.7 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Installation of a Two 3-megavolt Ampere Reactive Capacitor Banks on a New Concrete Pad in A-Area CX(s) Applied: B1.7 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Upgrade of Missouri Science and Technology Reactor for Distance Learning - Missouri University of Science and Technology CX(s) Applied: B1.7 Date: 11/28/2011 Location(s): Missouri Offices(s): Nuclear Energy, Idaho Operations Office
Minor Road and Utility Operations CX(s) Applied: B1.3, B1.7, B1.13, B1.32, B4.7 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation CX(s) Applied: A9, B1.7 Date: 11/21/2011 Location(s): New York, California Offices(s): Advanced Research Projects Agency-Energy
Integration of the Green Lane Energy Biogas Generator CX(s) Applied: B1.7 Date: 11/17/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
State Energy Program American Recovery and Reinvestment Act - Washington State University Anaerobic Digester - Nutrient Recovery TechnologyCX(s) Applied: A9, B1.7, B5.1Date: 09/23/2011Location(s): WashingtonOffice(s): Energy Efficiency and Renewable En...
Maxwell - O'Banion Optical Ground WireCX(s) Applied: B1.7, B4.6, B4.7, B4.11Date: 09/15/2011Location(s): Sutter County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region, National Energy Technology Laboratory
CNI Technical Service, Contractor Providing Technical and Administrational Computer SupportCX(s) Applied: A1, B1.7, B1.27Date: 09/07/2011Location(s): Chicago, IllinoisOffice(s): Science, Chicago Office
Integration of G0387 Energetics Solar Integration ProjectCX(s) Applied: B1.7, B4.6Date: 09/01/2011Location(s): Lake County, OregonOffice(s): Bonneville Power Administration