ADAS System Life Cycle Support, 2012-2015 CX(s) Applied: B1.7 Date: 10/02/2012 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction Offices(s...
Security Camera Installation CX(s) Applied: A11, B1.7, B1.15, B2.2, B2.3 Date: 09/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Morgantown Parking Garage Fire Alarm System CX(s) Applied: B1.3, B1.7, B1.15, B2.5 Date: 09/13/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
B-22A Renovation CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5 Date: 08/31/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Albany PBX Upgrade CX(s) Applied: B1.7 Date: 08/30/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 33 Conference Room Upgrades CX(s) Applied: B1.7 Date: 08/28/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Pull/Install New Fiber Optic Cables From 241-2H to 241-62F (General) CX(s) Applied: B1.7 Date: 08/23/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Morgantown Parking Garage Fire Alarm System CX(s) Applied: B1.3, B1.7, B2.5 Date: 08/08/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration