Categorical Exclusion Determination
773-A, E004/008/131 Roof Replacement CX(s) Applied: B1.3Date: 06/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
St. Johns-St. Helens Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Dewatering and Impoundment Removal at 685-25G New Fire Pond CX(s) Applied: B1.3Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Capitol Peak Communication Site Back-up Generator Replacement CX(s) Applied: B1.3Date: 06/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Tenkiller Dam and Norfolk Substation Protective Relay and Control Switchboard Panel Replacements CX(s) Applied: B1.3Date: 06/22/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration
Subcontractor Will Provide Roof Repairs at 789-2B CX(s) Applied: B1.3Date: 06/18/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 717-K CX(s) Applied: B1.3Date: 06/18/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Shelton-Fairmount No. 1 Switches Replacement Project CX(s) Applied: B1.3Date: 06/18/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Convert Leak Detection Boxes LDB-1A and LDB-2A at FDB-2 to modified LDB's CX(s) Applied: B1.3Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office