Kalispell-Kerr No. 1 Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 07/06/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Western Sector Treatment System (WSTS) Maintenance Activities CX(s) Applied: B1.3Date: 07/02/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Chenoweth Substation Water and Sewer Connection CX(s) Applied: B1.3Date: 07/02/2015 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Longview Osmose 2015 Corrosion Mitigation and Repair Project CX(s) Applied: B1.3Date: 07/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Dome Tap-Wellton Mohawk Ligurta - Replace Structure CX(s) Applied: B1.3Date: 07/01/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Install Blank on Line WEE-3222 after 242016F Overheads CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replacing HVAC systems in Six Facilities Across the Site CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Bell Substation HVAC Replacement CX(s) Applied: B1.3Date: 06/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
773-A, E004/008/131 Roof Replacement CX(s) Applied: B1.3Date: 06/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office