Big Hill Site Building Upgrades, Phase 2 CX(s) Applied: B1.3Date: 08/10/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Forest Grove-McMinnville Wood Pole Replacement Projects CX(s) Applied: B1.3Date: 08/10/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Albany Substation Control House Floor Replacement CX(s) Applied: B1.3Date: 08/10/2015 Location(s): OregonOffices(s): Bonneville Power Administration
785-6A Outside Painting Exterior Equipment and Safety Items CX(s) Applied: B1.3Date: 08/07/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Blythe-Headgate Rock X-Brace Replacement CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Parker Dam Pole Replacement CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Blythe-Knob 161 Kilovolt Transmission Line, Pole Replacements at Interstate 10 Crossing CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Timber Tap Wood Pole Replacement Project 2015 CX(s) Applied: B1.3Date: 08/07/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Southwestern Power Administration proposes to replace overhead ground wire with OPGW on its Springfield, MO to Nixa, MO, to Table Rock, MO, to Gran…
Replace 6" Piping at West Hackberry Disposal Wells CX(s) Applied: B1.3Date: 08/03/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office