Subcontractor Will Provide Roof Repairs at 703-46A CX(s) Applied: B1.3Date: 08/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 716-N CX(s) Applied: B1.3Date: 08/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Back-up Generator Replacements at Kenyon Mountain Communication Site and Scott Mountain Communication Site CX(s) Applied: B1.3Date: 08/26/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Replace Saltstone Disposal Unit 3/5 Diverter Valve Spool Piece CX(s) Applied: B1.3Date: 08/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Little Goose-Lower Granite #1 Fiber Repair Project CX(s) Applied: B1.3Date: 08/19/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Replace Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/17/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
PXP-15-0005 Routine Administrative, Maintenance, and Operating Activities Planned at Pantex Plant for Fiscal year 2016 and 2017 CX(s) Applied: B1.3Date: 08/12/2015 Location(s): TexasOffices(s): Pantex Site Office
Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Herbicide Application at Mexico Tap CX(s) Applied: B1.3Date: 08/11/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Fiscal year 2015 Wood Pole Replacements along the Libby-Bonners Ferry Transmission Line CX(s) Applied: B1.3Date: 08/10/2015 Location(s): IdahoOffices(s): Bonneville Power Administration