151-1K Substation/switchgear Replacement CX(s) Applied: B1.3Date: 10/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Development Pump Testing at 723-A Mechanical Shop, Room 161 CX(s) Applied: B1.3Date: 10/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Saltstone Hopper Overflow Container (SHOC) Redesign CX(s) Applied: B1.3Date: 10/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Routine Activities CX(s) Applied: B1.3, B1.4, B1.6, B1.7, B1.9, B1.11, B1.16, B1.17, B1.20, B1.22, B1.23, B1.24, B1.25, B1.30, B1.34, B2.2, B2.3, B2.5, B4.1, B4.2, B4.3, B4.4, B4.6, B4.8, B4.10, B5.1, B5.6Date: 10/25/2015 Location(s): Multiple Location...
Hydrilla Control at PAR Pond Boat Dock CX(s) Applied: B1.3Date: 10/22/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
CHPRC Routine Maintenance CX(s) Applied: B1.3Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
151-1L Substation/switchgear Replacement CX(s) Applied: B1.3Date: 10/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Eagle Fish Hatchery Maintenance Funding CX(s) Applied: B1.3Date: 10/13/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Replacing Carpet & Tile Associated with RPD Offices in KAC Personnel Wing CX(s) Applied: B1.3Date: 10/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Glovebox, LAB-GB-52-A CX(s) Applied: B1.3Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office