Hood River-Coop Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 01/20/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Repaint Fire Tank 915-K CX(s) Applied: B1.3Date: 01/20/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace WHT-1 Flush Water and WHT-10 Seal Flush Tanks CX(s) Applied: B1.3Date: 01/11/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
MERC-1 Natural Gas Well Closure CX(s) Applied: B1.3, B5.2, B5.3, B5.12, B1.34Date: 01/06/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services CX(s) Applied: B1.3Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Roof Repairs at 735-13A CX(s) Applied: B1.3Date: 12/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 705-N CX(s) Applied: B1.3Date: 12/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 234-H CX(s) Applied: B1.3Date: 12/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Inspection and Repair of West Hackberry-LCMS 36-Inch Crude Oil Pipeline CX(s) Applied: B1.3Date: 12/22/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace Section of Bryan Hill 36-Inch Crude Oil Pipeline at Hillebrandt Bayou CX(s) Applied: B1.3Date: 12/22/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office